ACG Project Portfolio
arrow India arrow Sri Lanka arrow Pakistan
arrow UAE arrow Indonesia arrow Vietnam
arrow Singapore arrow VER's  
     
Location Name CERs up to 2012 Status
India 7.5 MW Biomass Based Power Project 112,855 (Issued CERs)
India 20 MW Biomass Based Power Generation Project 538,665 (Registered with UNFCCC)
India 4 MW Wind Power Project 32,560 (Registered with UNFCCC)
India 9 MW Renewable Energy Grid Connected Biomass Power Project 241,595 (Registered with UNFCCC)
India Biomass Gasification Based Power Generation By Arashi Hi-Tech Bio-Power Private Limited 6,248 (Registered with UNFCCC)
India 7.2 MW Wind Power Project In Chitradurga, Karnataka 71,670 (Registered with UNFCCC)
India 8 MW WHR Project 127,955 (Registered with UNFCCC)
India 21 MW Biomass Based Power Generation Project 400,000 (Host Country Approval received and under validation)
India Biomass Gasification 46,500 (Host Country Approval received and under validation)
India 8.6 MW Wind Project 77,080 (Host Country Approval received and under validation)
India Biomass Boiler 170,000 (Host Country Approval received and under validation)
India 7.4 MW Natural Gas Based Combined Cycle Package Cogeneration Power Plant 664,916 (Host Country Approval received and under validation)
India 40 MW Wind Project (First FDI) 313,670 (Host Country Approval received and under validation)
India Energy Efficient AAC Project 143,375 (Host Country Approval received and under validation)
India Replacement Of Conventional Crystallizers With Acid Absorption Crystallizers 161,917 (Host Country Approval received and under validation)
India Energy Efficient Building 37,644 (Host Country Approval received and under validation)
India 13.65 MW Wind Project 123,980 (Submitted for Host Country Approval)
India Fuel Switch From Furnace Oil To Renewable Energy Biomass Briquettes 17,164 (Submitted for Host Country Approval)
India Natural Gas Based Packaged Cogeneration 199,500 (Submitted for Host Country Approval)
India Usage Of Gas Displacing Furnace Oil For Thermic Fluid Heating 61,220 (Submitted for Host Country Approval)
India 23 MW Hydro Power Project North Goa 255,845 (Submitted for Host Country Approval)
India 14 MW Hydro Power Project, North Goa 147,075 (Submitted for Host Country Approval)
India 15 MW Hydro Power Project, North Goa 170,665 (Submitted for Host Country Approval)
India Replacement Of Conventional Stoker Boiler By Energy Efficient Atmospheric Fluidized Bed Combustion Boiler 137,112 (Submitted for Host Country Approval)
India Electric Scooter Project 168,640 (Submitted for Host Country Approval)
India Dry Fog Dust Suppression System At Blast Furnace #4 20190 (Submitted for Host Country Approval)
India Coke Dry Quenching (CDQ) In New Battery #10 601,540 (Submitted for Host Country Approval)
India Installation Of Top Gas Recovery Turbine (TRT) At Blast furnace 1,369,504 (Submitted for Host Country Approval)
India Waste Gas Based Energy Generation Project 1,443,744 (Submitted for Host Country Approval)
India Waste Heat Recovery Project At Sinter Plant 518,404 (Submitted for Host Country Approval)
India Hot Stove Waste Heat Recovery For Coal Dust Injection Unit Of Blast Furnace By Steel Plant 28,575 (Submitted for Host Country Approval)
India Blast Furnace Gas Utilisation For CPP At  Steel Plant 842,780 (Submitted for Host Country Approval)
India Replacement Of Multi-Cyclones With Electro Static Precipitators (ESP) In Sinter Plant At  Steel Plant 30,890 (Submitted for Host Country Approval)
India Use Of By-Product Fuel For Power Generation 722,365 (Submitted for Host Country Approval)
India Installation Of Multi-Slit Burner In Both Strands Of Sinter Plant  At Steel Plant,  Steel Plant 62,644 (Submitted for Host Country Approval)
India 6.6 MW Grid Connected Wind Power Project Not known  (PDD under development)
India Purulia 900MW Pumped Hydro Storage Project Not known  (PDD under development)
India Replacement Of Conventional Crystallizers With Acid Absorption Crystallizers At Birla Cellulosic 87,342 (PDD under development)
India Double Extraction Condensation Turbine 60,660 (PDD under development)
India 2.42 MW Myntdu-Leshka H.E. Project in Meghalaya 781,200 (PDD under development)
India Optimisation of Diesel Generator (DG) Operating Hours in Base Transceiver Stations (BTS) 54,532 (PDD under development)
India Natural Gas Based Packaged Cogeneration 293385 (PDD under development)
India Community Based Bundled Waste To Biogas Project For Cooking Purposes 9,000 (PDD under development)
India Indian Metro Methodology Under Development (PDD under development)
India Utilisation Of Otherwise Vented Out Vapor From Oil Wells 2,744 (PDD under development)
India Energy Efficient Building Not known (PDD under development)
India Displacement Of Diesel Tankers For Transportation Of Crude By Pipelines Not known (PDD under development)
India Displacement Of Diesel Tankers For Transportation Of Crude By Pipelines 6,000 (PDD under development)
India Reduction Of Gas Firing 7,152 (PDD under development)
India Up Gradation Of Blast Furnace #6 Not known (PDD under development)
India Coal Dust Injection(CDI) In Blast Furnace #3 & 4 880,000 (PDD under development)
India Replacement Of Sinter Plant #1 By Energy Efficient Sinter Plant #3 70,000 (PDD under development)
India Increase In Blast Temperature And Oxygen Enrichment In Blast Furnace #3 & 4 Not known (PDD under development)
India Reconstruction Of Blast Furnace #1 Not known (PDD under development)
India Rebuilding Of Battery #2 &4 Not known (PDD under development)
India Coal Dust Injection (CDI) In Blast Furnace 132,000 (PDD under development)
India Re-Commissioning Of Heat Recovery System In Sinter Plant #2 70,000 (PDD under development)
India Provision Of Blast Furnace Slag Based Cement Plant Not known (PDD under development)
India Coal Dust Injection (CDI) In Blast Furnace #2 & 3 28,575 (PDD under development)
India Waste Heat Recovery At Blast Furnace Stoves 312,755 (PDD under development)
India Thyristerisation Of Blast Furnace #3 & 4 Skip Hoist Electric Supply For Better Operation Efficiency And Energy Conservation At A Steel Plant 18,455 (PDD under development)
      top
Sri Lanka A/R Project 23,500  
      top
Pakistan Natural Gas Based Packaged Cogeneration 356,300  
      top
UAE Natural Gas Based Packaged Cogeneration 556,590  
UAE Usage Of Gas Displacing Furnace Oil For Thermic Fluid Heating 205,000  
UAE Biogas Based Steam Generation Project By A Paper Mill 42,620  
      top
Indonesia Methane Capture from Wastewater Treatment 1,200,000 (Under Verification)
Indonesia Fuel Switch from Heavy Fuel Oil to Natural Gas for Power Generation 176,000 (New Methodology Approved, Under Validation)
Indonesia Mini Hydro, 10 MW 80,000 (Under Validation)
Indonesia Installation of Circulating Fluidized Bed Boiler and Back Pressure Turbine 48,000 (Under Validation)
Indonesia Fuel Switching in Glass Industry 450,000 (Under Validation)
Indonesia Utilization of Waste Heat from Sulphur Recovery Unit to Generate Electrical Power 17,000 (Under Validation)
Indonesia 5.9 MW Fuel Switching and Cogeneration 122,500 (PDD under development)        
Indonesia Fuel Switching from HFO to Natural Gas for Thermal Purpose 35,000 (PDD under development)    
Indonesia Methane Capture from Wastewater Treatment 280,000 (PDD under development)
Indonesia Methane Avoidance by Composting of Municipal Solid Waste 240,000 (PDD under development)
Indonesia Methane Avoidance by Heat Generation of Municipal Solid Waste 192,000 (PDD under development)
Indonesia Installation of Energy-Efficient Sulphuric Acid Plant 12,000 (PDD under development)
Indonesia Mini-Hydro, 4.6 MW 84,000 (PDD under development)
Indonesia Mini-Hydro, 2 x 2.5 MW 47,000 (PDD under development)
Indonesia Methane Avoidance Project from Tapioca Starch Plant 600,000 (PDD under development)
Indonesia Geothermal 270,000 (PDD under development)
Indonesia Energy Efficiency in Textile Industry-Staple Fiber 160,000 (Carbon due diligence)
      top
Vietnam 57 MW Grid Connected Hydro Power Project 501,344 (DNA approval obtained and  under validation)
Vietnam 10.8 MW Grid Connected Hydro Power Project 149,011 (DNA approval obtained and  under validation)
Vietnam 16 MW Grid Connected Hydro Power Project 132,599 (DNA approval obtained and  under validation)
Vietnam 28 MW Grid Connected Hydro Power Project 264,170 (DNA approval obtained and  under validation)
Vietnam 18 MW Grid Connected Hydro Power Project   208,246 (PDD under development)
Vietnam 20 MW Grid Connected Hydro Power Project   236,298 (PDD under development)
Vietnam 7.5 MW Grid Connected Hydro Power Project   87,500 (PDD under development)
Vietnam 10.2 MW Grid Connected Hydro Power Project   125,000 (PDD under development)
Vietnam 3 MW Grid Connected Hydro Power Project 32,335 (PDD under development)
Vietnam 4 MW Grid Connected Hydro Power Project 39,300 (PDD under development)
Vietnam 6.5 MW Grid Connected Hydro Power Project   48,750 (PDD under development)
Vietnam 6 MW Grid Connected Hydro Power Project   45,000 (PDD under development)
Vietnam 5.8 MW Grid Connected Hydro Power Project   45,000 (PDD under development)
Vietnam 18 MW Grid Connected Hydro Power Project   114,800 (PDD under development)
Vietnam 15 MW Grid Connected Hydro Power Project   37,500 (PDD under development)
Vietnam 9.3 MW Grid Connected Hydro Power Project   25,000 (PDD under development)
Vietnam 7.2 MW Grid Connected Hydro Power Project   53,100 (PDD under development)
Vietnam 4 MW Grid Connected Hydro Power Project   28,800 (PDD under development)
Vietnam 3.4 MW Grid Connected Hydro Power Project   32,000 (PDD under development)
      top
Singapore Fuel Switch & Co-Generation Project 19,688 (PDD under development)
Singapore 10 MW Power Generation Based On Food Waste 38,183 (Under validation)
      top
VERs 13.65 MW  Grid Connected Wind Power Project 106,205  
VERs 8.6 MW Wind Project 60,625  
VERs Replacement Of Conventional Crystallizers With Acid Absorption Crystallizers Birla Cellulosic 15,000  
VERs HFO to Natural Gas – Fuel Switch – Power Generation (INDONESIA) 65,000  
VERs Energy Efficiency Improvement In Building Utility 23,100  
VERs Heat recovery from sinter cooler of sinter plant Not known  
VERs Coal Dust Injection (CDI) in Blast Furnace 1, 5 & 7 600,000  
VERs Blast Furnace Gas Utilisation At Boiler #6 Of Power Plant-1 945,600  
VERs Thyristerisation Of Blast Furnace #3 & 4 Skip Hoist Electric Supply For Better Operation Efficiency And Energy Conservation 7,800  
VERs Tar Injection In Blast Furnace #2 216,230  
VERs Installation Of Multi-Slit Burners In Both Strands Of Sinter Plant #1 1,303,603  
VERs Provision Of Blast Furnace Gas Firing System In Boiler #6 328,300  
VERs Commissioning Of Multi-Slit Burner In Sinter Plant 406,000  
VERs Coal Dust Injection (CDI) In Blast Furnace #5 185,500  
VERs Introduction Of Gas Firing (Blast Furnace Gas + Coke Oven Gas) In Boiler Unit B Not known  
      top